Import Limitation to Enable System Electrification
As the race to zero carbon drives the greater electrification of our transport & heating systems, we’re finding that more and more of our infrastructure is hitting physical limits (e.g. transformer sizes etc). This is leading to the imposition of IMPORT LIMITS which restrict the import of electricity either by time, physical power levels or both. To solve this problem and allow the installation of the required infrastructure, Argand’s GridGEM can sit between your own network and the DNO to guarantee the management of these critical risks.
Manage EV Charging Points
The GridGEM import limitation solution can interact with your electric vehicle charing points to ensure the the combined charging power will not take you above your agreed import limits.
Manage Electric Heat
The GridGEM import limitation solution can monitor and interact with you heating & cooling systems to ensure that the load(s) are managed to ensure you remain within your agreed import limits.
Integrate with Energy Storage
The GridGEM import limitation solution can interact with an on-site energy storage system to ensure that the physical import limits are maintained in combination with transport & heat.